| Paks Nuclear Power Plant. Reactor Protection System TELEPERM XS system upgrade. Basic and detailed design | 2017-2020. |
| Paks Nuclear Power Plant. Environment and Emission Monitoring System reconstruction I. stage. Detailed design | 2017-2018. |
| Paks Nuclear Power Plant. Reactor Protection System TELEPERM XS system upgrade. Basic and detailed design | 2017-2020. |
| Paks Nuclear Power Plant. Environment and Emission Monitoring System reconstruction I. stage. Detailed design | 2017-2018. |
| Paks Nuclear Power Plant. Unit 3. Reactivity Monitoring and Outage Neutronflux Monitoring System reconstruction. Detailed design | 2016-2020. |
| Paks Nuclear Power Plant. Emergency and unit common uninterruptable power supply systems reconstruction. Detailed design | 2016-2020. |
| Paks Nuclear Power Plant. Refurbishment of Rod Control System and Reactor Power Control System. Basic and detailed design | 2015-2021. |
| Paks Nuclear Power Plant. Reconstruction of 0,4 kV switchgear (06R). Detailed design | 2015-2021. |
| Paks Nuclear Power Plant. Emergency cooling water system, exchange of pipelines over DN200. I&C basic and detailed design | 2015-2021. |
| Paks Nuclear Power Plant. Cementing equipment for solidifying of fluid radioactive waste. Electrical and I&C detailed design | 2015-2020. |
| Paks Nuclear Power Plant. Renewal of roof and HVAC systems of Central Office Building. Electrical and I&C detailed design | 2015. |
| Paks Nuclear Power Plant. Reconstruction of ventilation system of primary and secondary circuits’ laundry. Electrical and I&C detailed design | 2014-2015. |
| Paks Nuclear Power Plant. Diesel generator station for severe accident. Electrical and I&C basic design | 2014-2015. |
| Paks Nuclear Power Plant. New Fireman’s Base. Electrical supply, building electricity, low voltage, I&C detailed design | 2014-2015. |
| Paks Nuclear Power Plant. Mobile energy supply system of Severe Accident Diesel Generators No. 13 and 14. Feasibility study | 2014. |
| Paks Nuclear Power Plant. Reconstruction of ventilation and air conditioning systems Phase II. (relay rooms, reactor and auxiliary buildings). Electrical and I&C detailed design | 2013-2020. |
| Paks Nuclear Power Plant. Refurbishment of control and protection system of 6 kV switchgear. Detailed design | 2013-2021. |
| Paks Nuclear Power Plant. Prevention of overpressure of containment in case of accident. Electrical and I&C feasibility study and basic design | 2013-2016. |
| Paks Nuclear Power Plant. Units 3-4. Installation of new demineralized water tanks. Electrical and I&C basic design | 2013-2014. |
| Paks Nuclear Power Plant. Refurbishment of chilled water plant and chilled water system. Electrical and I&C detailed design | 2013. |
| Paks Nuclear Power Plant. Refurbishment of earth quake monitoring system. Basic and detailed design | 2013-2014. |
| Paks Nuclear Power Plant. Refurbishment of main switchgear type 06R. Basic design | 2012-2013. |
| Paks Nuclear Power Plant. Lengthwise interconnection and crosswise coupling of bus bars 10-40BM-BL. Basic design | 2013-2014. |
| Paks Nuclear Power Plant. Implementation of diesel generators for prevention of accident and for maintenance purposes. Feasibility study | 2012-2013. |
| Paks Nuclear Power Plant. Implementation of surface meteorological measuring system, pilot phase. Detailed design | 2012. |
| Budapest University of Technology and Economics. Electrical refurbishment of building marked “TR” of Institute of Nuclear Techniques. Detailed design | 2012. |
| Paks Nuclear Power Plant. Blind spot proof monitoring system for exterior boundary track. Electrical detailed design | 2011-2013. |
| Paks Nuclear Power Plant. Refurbishment of control and protection system of 6 kV switchgear. Basic design | 2011. |
| Paks Nuclear Power Plant. Replace of built-in halon extinguisher system. Electrical, I&C and fire protection detailed design | 2011. |
| Paks Nuclear Power Plant. Units 1-3. Extension of operational life-time. Database setup of I&C technical data based on engineering design works | 2010-2012. |
| Paks Nuclear Power Plant. Refurbishment of process control system examination of cabling, cable support system, possibilities of pre-assembling. Feasibility studies | 2010-2011. |
| Paks Nuclear Power Plant. Refurbishment of excitation system of turbo generators type TVV-221. Detailed design | 2009-2013. |
| Paks Nuclear Power Plant. Electrical supply system for treatment of severe accident. Detailed design | 2009-2010. |
| Bátaapáti National Radioactive Waste Repository. Underground facilities. Electrical detailed design | 2009. |
| Paks Nuclear Power Plant. Reconstruction of ventilation and air conditioning systems phase I. Electrical and I&C detailed design | 2008-2011. |
| Paks Nuclear Power Plant. Units 3-4. Refurbishment of speed regulation and control system of diesel generators. Detailed design | 2008-2010. |
| Paks Nuclear Power Plant. Avoiding of throughflows from primary to secondary – Blowing-off the steam generators from the water side. Electrical and I&C detailed design | 2008-2010. |
| Paks Nuclear Power Plant. Supervision of radiation protection, check on working places and technological systems (electric supply, air sampling system, control of hermetic doorways, cabling). Electrical and I&C detailed design | 2007. |
| Paks Nuclear Power Plant. Electrical and I&C reconstruction of the most important cranes (exchange of power supply conductor systems, electrical installation). Basic design | 2005. |
| Paks Nuclear Power Plant. Units 1-2. Emergency cooling water system exchange of pipelines under DN200. I&C detailed design | 2004-2006. |
| Paks Nuclear Power Plant. Unit 2. Breakdown prevention in shaft Nr. 1. Auxiliary systems for removing damaged fuel rods. (power supply, level control and connected water cleaners). Electrical and I&C basic and detailed design | 2003-2005. |
| Paks Nuclear Power Plant. Electrical and I&C equipment of reconstruction of primary overpressure protection system. Basic and detailed design | 1999-2001. |
| Paks Nuclear Power Plant. Electrical and I&C equipment of earthquake protection system. Detailed design | 1998-2003. |
| Paks Nuclear Power Plant. Reactor refurbishment project, implementation of the new protection system (electrical measuring, power supply, cabling inside and outside the containment). Cabling specifications and detailed design | 1996-2001. |
| Paks Nuclear Power Plant. Electrical and I&C equipment of displacement of auxiliary emergency feedwater system. Detailed design | 1995-1998. |