REFERENCES

Nuclear Facilities
Paks Nuclear Power Plant. Reactor Protection System TELEPERM XS system upgrade.
Basic and detailed design
2017-2020.
Paks Nuclear Power Plant. Environment and Emission Monitoring System reconstruction I. stage.
Detailed design
2017-2018.
Paks Nuclear Power Plant. Reactor Protection System TELEPERM XS system upgrade.
Basic and detailed design
2017-2020.
Paks Nuclear Power Plant. Environment and Emission Monitoring System reconstruction I. stage.
Detailed design
2017-2018.
Paks Nuclear Power Plant. Unit 3. Reactivity Monitoring and Outage Neutronflux Monitoring System reconstruction.
Detailed design
2016-2020.
Paks Nuclear Power Plant. Emergency and unit common uninterruptable power supply systems reconstruction.
Detailed design
2016-2020.
Paks Nuclear Power Plant. Refurbishment of Rod Control System and Reactor Power Control System.
Basic and detailed design
2015-2021.
Paks Nuclear Power Plant. Reconstruction of 0,4 kV switchgear (06R).
Detailed design
2015-2021.
Paks Nuclear Power Plant. Emergency cooling water system, exchange of pipelines over DN200.
I&C basic and detailed design
2015-2021.
Paks Nuclear Power Plant. Cementing equipment for solidifying of fluid radioactive waste.
Electrical and I&C detailed design
2015-2020.
Paks Nuclear Power Plant. Renewal of roof and HVAC systems of Central Office Building.
Electrical and I&C detailed design
2015.
Paks Nuclear Power Plant. Reconstruction of ventilation system of primary and secondary circuits’ laundry.
Electrical and I&C detailed design
2014-2015.
Paks Nuclear Power Plant. Diesel generator station for severe accident.
Electrical and I&C basic design
2014-2015.
Paks Nuclear Power Plant. New Fireman’s Base.
Electrical supply, building electricity, low voltage, I&C detailed design
2014-2015.
Paks Nuclear Power Plant. Mobile energy supply system of Severe Accident Diesel Generators No. 13 and 14.
Feasibility study
2014.
Paks Nuclear Power Plant. Reconstruction of ventilation and air conditioning systems Phase II. (relay rooms, reactor and auxiliary buildings).
Electrical and I&C detailed design
2013-2020.
Paks Nuclear Power Plant. Refurbishment of control and protection system of 6 kV switchgear.
Detailed design
2013-2021.
Paks Nuclear Power Plant. Prevention of overpressure of containment in case of accident.
Electrical and I&C feasibility study and basic design
2013-2016.
Paks Nuclear Power Plant. Units 3-4. Installation of new demineralized water tanks.
Electrical and I&C basic design
2013-2014.
Paks Nuclear Power Plant. Refurbishment of chilled water plant and chilled water system.
Electrical and I&C detailed design
2013.
Paks Nuclear Power Plant. Refurbishment of earth quake monitoring system.
Basic and detailed design
2013-2014.
Paks Nuclear Power Plant. Refurbishment of main switchgear type 06R.
Basic design
2012-2013.
Paks Nuclear Power Plant. Lengthwise interconnection and crosswise coupling of bus bars 10-40BM-BL.
Basic design
2013-2014.
Paks Nuclear Power Plant. Implementation of diesel generators for prevention of accident and for maintenance purposes.
Feasibility study
2012-2013.
Paks Nuclear Power Plant. Implementation of surface meteorological measuring system, pilot phase.
Detailed design
2012.
Budapest University of Technology and Economics. Electrical refurbishment of building marked “TR” of Institute of Nuclear Techniques.
Detailed design
2012.
Paks Nuclear Power Plant. Blind spot proof monitoring system for exterior boundary track.
Electrical detailed design
2011-2013.
Paks Nuclear Power Plant. Refurbishment of control and protection system of 6 kV switchgear.
Basic design
2011.
Paks Nuclear Power Plant. Replace of built-in halon extinguisher system.
Electrical, I&C and fire protection detailed design
2011.
Paks Nuclear Power Plant. Units 1-3. Extension of operational life-time.
Database setup of I&C technical data based on engineering design works
2010-2012.
Paks Nuclear Power Plant. Refurbishment of process control system examination of cabling, cable support system, possibilities of pre-assembling.
Feasibility studies
2010-2011.
Paks Nuclear Power Plant. Refurbishment of excitation system of turbo generators type TVV-221.
Detailed design
2009-2013.
Paks Nuclear Power Plant. Electrical supply system for treatment of severe accident.
Detailed design
2009-2010.
Bátaapáti National Radioactive Waste Repository. Underground facilities.
Electrical detailed design
2009.
Paks Nuclear Power Plant. Reconstruction of ventilation and air conditioning systems phase I.
Electrical and I&C detailed design
2008-2011.
Paks Nuclear Power Plant. Units 3-4. Refurbishment of speed regulation and control system of diesel generators.
Detailed design
2008-2010.
Paks Nuclear Power Plant. Avoiding of throughflows from primary to secondary – Blowing-off the steam generators from the water side.
Electrical and I&C detailed design
2008-2010.
Paks Nuclear Power Plant. Supervision of radiation protection, check on working places and technological systems (electric supply, air sampling system, control of hermetic doorways, cabling).
Electrical and I&C detailed design
2007.
Paks Nuclear Power Plant. Electrical and I&C reconstruction of the most important cranes (exchange of power supply conductor systems, electrical installation).
Basic design
2005.
Paks Nuclear Power Plant. Units 1-2. Emergency cooling water system exchange of pipelines under DN200.
I&C detailed design
2004-2006.
Paks Nuclear Power Plant. Unit 2. Breakdown prevention in shaft Nr. 1. Auxiliary systems for removing damaged fuel rods. (power supply, level control and connected water cleaners).
Electrical and I&C basic and detailed design
2003-2005.
Paks Nuclear Power Plant. Electrical and I&C equipment of reconstruction of primary overpressure protection system.
Basic and detailed design
1999-2001.
Paks Nuclear Power Plant. Electrical and I&C equipment of earthquake protection system.
Detailed design
1998-2003.
Paks Nuclear Power Plant. Reactor refurbishment project, implementation of the new protection system (electrical measuring, power supply, cabling inside and outside the containment).
Cabling specifications and detailed design
1996-2001.
Paks Nuclear Power Plant. Electrical and I&C equipment of displacement of auxiliary emergency feedwater system.
Detailed design
1995-1998.