Paks Nuclear Power Plant. Reactor Protection System TELEPERM XS system upgrade. Basic and detailed design 2017-2020.
Paks Nuclear Power Plant. Environment and Emission Monitoring System reconstruction I. stage. Detailed design 2017-2018.
Paks Nuclear Power Plant. Unit 3. Reactivity Monitoring and Outage Neutronflux Monitoring System reconstruction. Detailed design 2016-2020.
Paks Nuclear Power Plant. Emergency and unit common uninterruptable power supply systems reconstruction. Detailed design 2016-2020.
Paks Nuclear Power Plant. Refurbishment of Rod Control System and Reactor Power Control System. Basic and detailed design 2015-2021.
Paks Nuclear Power Plant. Reconstruction of 0,4 kV switchgear (06R). Detailed design 2015-2021.
Paks Nuclear Power Plant. Emergency cooling water system, exchange of pipelines over DN200. I&C basic and detailed design 2015-2021.
Paks Nuclear Power Plant. Cementing equipment for solidifying of fluid radioactive waste. Electrical and I&C detailed design 2015-2020.
Paks Nuclear Power Plant. Renewal of roof and HVAC systems of Central Office Building. Electrical and I&C detailed design 2015.
Paks Nuclear Power Plant. Reconstruction of ventilation system of primary and secondary circuits’ laundry. Electrical and I&C detailed design 2014-2015.
Paks Nuclear Power Plant. Diesel generator station for severe accident. Electrical and I&C basic design 2014-2015.
Paks Nuclear Power Plant. New Fireman’s Base. Electrical supply, building electricity, low voltage, I&C detailed design 2014-2015.
Paks Nuclear Power Plant. Mobile energy supply system of Severe Accident Diesel Generators No. 13 and 14. Feasibility study 2014.
Paks Nuclear Power Plant. Reconstruction of ventilation and air conditioning systems Phase II. (relay rooms, reactor and auxiliary buildings). Electrical and I&C detailed design 2013-2020.
Paks Nuclear Power Plant. Refurbishment of control and protection system of 6 kV switchgear. Detailed design 2013-2021.
Paks Nuclear Power Plant. Prevention of overpressure of containment in case of accident. Electrical and I&C feasibility study and basic design 2013-2016.
Paks Nuclear Power Plant. Units 3-4. Installation of new demineralized water tanks. Electrical and I&C basic design 2013-2014.
Paks Nuclear Power Plant. Refurbishment of chilled water plant and chilled water system. Electrical and I&C detailed design 2013.
Paks Nuclear Power Plant. Refurbishment of earth quake monitoring system. Basic and detailed design 2013-2014.
Paks Nuclear Power Plant. Refurbishment of main switchgear type 06R. Basic design 2012-2013.
Paks Nuclear Power Plant. Lengthwise interconnection and crosswise coupling of bus bars 10-40BM-BL. Basic design 2013-2014.
Paks Nuclear Power Plant. Implementation of diesel generators for prevention of accident and for maintenance purposes. Feasibility study 2012-2013.
Paks Nuclear Power Plant. Implementation of surface meteorological measuring system, pilot phase. Detailed design 2012.
Budapest University of Technology and Economics. Electrical refurbishment of building marked “TR” of Institute of Nuclear Techniques. Detailed design 2012.
Paks Nuclear Power Plant. Blind spot proof monitoring system for exterior boundary track. Electrical detailed design 2011-2013.
Paks Nuclear Power Plant. Refurbishment of control and protection system of 6 kV switchgear. Basic design 2011.
Paks Nuclear Power Plant. Replace of built-in halon extinguisher system. Electrical, I&C and fire protection detailed design 2011.
Paks Nuclear Power Plant. Units 1-3. Extension of operational life-time. Database setup of I&C technical data based on engineering design works 2010-2012.
Paks Nuclear Power Plant. Refurbishment of process control system examination of cabling, cable support system, possibilities of pre-assembling. Feasibility studies 2010-2011.
Paks Nuclear Power Plant. Refurbishment of excitation system of turbo generators type TVV-221. Detailed design 2009-2013.
Paks Nuclear Power Plant. Electrical supply system for treatment of severe accident. Detailed design 2009-2010.
Paks Nuclear Power Plant. Reconstruction of ventilation and air conditioning systems phase I. Electrical and I&C detailed design 2008-2011.
Paks Nuclear Power Plant. Units 3-4. Refurbishment of speed regulation and control system of diesel generators. Detailed design 2008-2010.
Paks Nuclear Power Plant. Avoiding of throughflows from primary to secondary – Blowing-off the steam generators from the water side. Electrical and I&C detailed design 2008-2010.
Paks Nuclear Power Plant. Supervision of radiation protection, check on working places and technological systems (electric supply, air sampling system, control of hermetic doorways, cabling). Electrical and I&C detailed design 2007.
Paks Nuclear Power Plant. Electrical and I&C reconstruction of the most important cranes (exchange of power supply conductor systems, electrical installation). Basic design 2005.
Paks Nuclear Power Plant. Units 1-2. Emergency cooling water system exchange of pipelines under DN200. I&C detailed design 2004-2006.
Paks Nuclear Power Plant. Unit 2. Breakdown prevention in shaft Nr. 1. Auxiliary systems for removing damaged fuel rods. (power supply, level control and connected water cleaners). Electrical and I&C basic and detailed design 2003-2005.
Paks Nuclear Power Plant. Electrical and I&C equipment of reconstruction of primary overpressure protection system. Basic and detailed design 1999-2001.
Paks Nuclear Power Plant. Electrical and I&C equipment of earthquake protection system. Detailed design 1998-2003.
Paks Nuclear Power Plant. Reactor refurbishment project, implementation of the new protection system (electrical measuring, power supply, cabling inside and outside the containment). Cabling specifications and detailed design 1996-2001.
Paks Nuclear Power Plant. Electrical and I&C equipment of displacement of auxiliary emergency feedwater system. Detailed design 1995-1998.
Mátra Power Station Mining Plant. Setup of 6kV supply system. Electrical detailed design 2016-2018.
Vértes Power Station, Oroszlány Plant. Automatization of pumphouse for leaking water. Detailed design 2016.
Vértes Power Station, Oroszlány Plant. Lightning protection of buildings. Detailed design 2013.
Vértes Power Station, Oroszlány Plant. Tie up boxes for cabling of feed water pumps. Electrical detailed design and installation 2012.
Csepel II. Power Station. Revision of interlocking circuits of emergency supply. Electrical detailed design and installation 2008.
Vértes Power Station, Oroszlány Plant. Electrical supply of biomass blow-in system for boiler No. 2. Electrical detailed design and installation 2008.
Vértes Power Station, Oroszlány Plant. Electric reconstruction of water intake plant. Detailed design 2007.
Mátra Power Station, Bükkábrány Mining Plant. Coal mill and sorting equipment. Electrical detailed design 2006.
Dunamenti Power Plant Unit 6. Renewal of main electrical equipment (auxiliary switchgears of generator, excitation system, mosaic board in control room). Detailed design 2005.
Dunamenti Power Plant. Units 8-13. reconstruction of I&C Systems (DCS connection, uninterruptable power supply, control of regulators, on-off valves and electric consumers, equipment in the main control room). Electrical and I&C detailed design 2001-2003.
Mátra Power Plant, Bükkábrány Mining Plant. Electric and I&C equipment of retrofit (belt conveyors, machines, dewatering system). Electrical detailed design 1999-2000.
Mátra Power Station. Erection of flue gas desulphurization equipment (implementation of 15,75/6,6kV power transformers, enclosed busduct). Electrical detailed design 1998-1999.
Mátra Power Plant. Erection of DFTR 35/6kV transformer station (MV-switchgears, auxilliary LV-switchgears). Electrical Detailed design 1998-1999.
Mátra Power Plant, Visonta Mining Plant. Reconstruction of electrical and I&C system of MT-6 and HK-6 mining machines. Detailed design 1995.